Transportation
Longview Transit Center; Longview, WA

The Longview
Transit Center is a 10 bay, off-street bus transfer center with a 1250
SF passenger services building, car parking lot, and landscaping located
in downtown Longview. Hall Engineering Associates directed a team of
professional consultants from the conceptual stages of the project
through construction for Cowlitz Transit Authority (CTA). Hall
initially considered ten alternative sites for the project, comparing
several factors affecting the suitability of each site. We also
assisted with the successful application for an FTA project grant.
When a site
was selected Hall Engineering prepared a environmental assessment,
contamination survey, preliminary design and development cost estimate
for the project. Following the CTA Board of Directors and staff
approval of the preliminary design, we prepared the construction plans,
specifications and contract documents. We also furnished survey,
testing, and inspection services for construction.
Hall
Engineering represented
Valley Transit's interests during negotiating sessions with the City of
Walla Walla which resulted in two more bus stalls than originally
planned and the Transit's gaining wider bus lanes than originally
allowed by the City's layout. |